2009

November

PRE AND POST BATHYMETRIC SURVEY FOR DREDGING WORKS AT BAGAN LUAR INNER JETTY, BUTTERWORTH, PENANG.
Client: SEE SONG & SONS SDN. BHD.

Scope of Work:

  • Bathymetric Survey to determine the water depth for proposed dredging works
  • To provide survey report and drawing


October

BATHYMETRIC AND LAND SURVEY AT SG. LANGAT, SIJANGKANG, SELANGOR.
Client: CINTALAM SDN. BHD.

Scope of Work:

  • Bathymetric Survey to determine the water depth
  • Topographic Survey
  • To provide survey report and drawing

August

TOPOGRAPHIC AND HYDROGRAPHIC SURVEY FOR RECLAMATION OF 30 ACRES AT MUKIM KLEBANG, DAERAH MELAKA TENGAH, MELAKA.
Client: SEE SONG & SONS SDN. BHD.

Scope of Work:

  • Bathymetric Survey
  • Topographic Survey


July

POST BATHYMETRIC SURVEY FOR SUBMARINE PIPELINE FROM LUMUT TO PANGKOR.
Client: WIBAWA WORKS SDN. BHD.

Scope of Work:

  • Bathymetric Survey to determine the water depth
  • To provide survey report and drawing


June

SUBMARINE FIBRE OPTIC CABLE SEARCH & REPAIR WORKS AT BATU MAUNG, PENANG, SEG ‘C’ – SEBERANG PRAI TO DAMAR LAUT.
Client: RS & L MARINE SDN. BHD.

Scope of Work:

  • Provide positioning & navigation system on board
  • Anchor handling aided by DGPS
  • Cable Search – Grapnel Run
  • To provide the as-built survey report and as-built drawing.


April

SUBMARINE FIBRE OPTIC CABLE SEARCH & REPAIR WORKS AT TANJUNG KARANG, SEG ‘G’, TANJUNG KARANG – PORT KLANG.
Client: RS & L MARINE SDN. BHD.

Scope of Work:

  • Provide positioning & navigation system on board
  • Anchor handling aided by DGPS
  • Cable Search – Grapnel Run
  • To provide the as-built survey report and as-built drawing.


TOPOGRAPHIC AND HYDROGRAPHIC SURVEY WORKS FOR SUBMARINE POWER CABLE ROUTE, TAWAU TO PULAU SEBATIK, SABAH.
Client: PERSADA ELECTRICAL & ENGINEERING WORKS SDN. BHD.

Scope of Work:

  • Provision of positioning & navigation system on board
  • Bathymetric Survey
  • Side Scan Sonar Survey
  • Sub Bottom Profiling
  • Current Metering


SUBMARINE POWER CABLE INSTALLATION SURVEY WORKS AT PATTAYA, THAILAND.
Client: RS & L MARINE SDN. BHD.

Scope of Work:

  • Provision of real-time DGPS positioning and navigation system onboard Lay Barge and Anchor Handling Tug.
  • Assist the Lay Barge movement.
  • Assist the Anchor Handling Tug on the anchor patterns and locating the anchors


February

SUBMARINE POWER CABLE INSTALLATION SURVEY WORKS AT SRI RACHA, THAILAND
Client: RS & L MARINE SDN. BHD.

Scope of Work:

  • Provision of real-time DGPS positioning and navigation system onboard Lay Barge and Anchor Handling Tug.
  • Assist the Lay Barge movement.
  • Assist the Anchor Handling Tug on the anchor patterns and locating the anchors.


January

SUBMARINE POWER CABLE INSTALLATION SURVEY WORKS AT SATUN, THAILAND
Client: RS & L MARINE SDN. BHD.

Scope of Work:

  • Provision of real-time DGPS positioning and navigation system onboard Lay Barge and Anchor Handling Tug.
  • Assist the Lay Barge movement.
  • Assist the Anchor Handling Tug on the anchor patterns and locating the anchors.
  • Provision of as-built survey report and drawing.