2008

December

SUBMARINE FIBRE OPTIC CABLE INSTALLATION SURVEY WORKS AT PHILIPPINES.
Client: RS & L MARINE SDN. BHD.

Scope of Work:

  • Provision of real-time DGPS positioning and navigation system onboard Lay Barge and Anchor Handling Tug.
  • Assist the Lay Barge movement.
  • Assist the Anchor Handling Tug on the anchor patterns and locating the anchors.
  • Provision of as-built survey report and drawing.


October

SOIL SAMPLING & PROBING WORKS FOR PROPOSED SUBMARINE POWER CABLE ROUTE AT SATUN, THAILAND.
Client: RS & L MARINE SDN. BHD.

Scope of Work:

  • Seabed probing.
  • Soil samples acquisition.


September


SHORE END SUBMARINE POWER CABLE INSTALLATION SURVEY WORKS AT PULAU JEREJAK, PENANG.
Client: RS & L MARINE SDN. BHD.

Scope of Work:

  • Provision of real-time DGPS positioning and navigation system onboard Lay Barge and Anchor Handling Tug.
  • Assist the Lay Barge movement
  • Assist the Anchor Handling Tug on the anchor patterns and locating the anchors.
  • Provision of as-built survey report and drawing.


August

HYDROGRAPHIC AND TOPOGRAPHIC SURVEY FOR SUBMARINE POWER CABLE ROUTE AT SATUN, THAILAND.
Client: RS & L MARINE SDN. BHD.

Scope of Work:

  • Provision of positioning & navigation system on board
  • Bathymetric Survey
  • Side Scan Sonar Survey
  • Sub Bottom Profiling
  • Current Metering


July


SUBMARINE FIBRE OPTIC CABLE SEARCH & REPAIR WORKS AT PORT DICKSON, SEGMENT ‘H’ PORT KLANG – PORT DICKSON.
Client: RS & L MARINE SDN. BHD.

Scope of Work:

  • Provide positioning & navigation system on board
  • Anchor handling aided by DGPS
  • Cable Search – Grapnel Run
  • To provide the as-built survey report and as-built drawing.


May

HYDROGRAPHIC AND TOPOGRAPHIC SURVEY FOR SUBMARINE CABLE ROUTE, PULAU JEREJAK, PENANG.
Client: RS & L MARINE SDN. BHD.

Scope of Work:

  • Provide positioning & navigation system on board
  • Bathymetric Survey
  • Side Scan Sonar Survey
  • Sub Bottom Profiling Survey
  • Current Metering
  • Probing Survey


April

SHORE END SUBMARINE FIBRE OPTIC CABLE INSTALLATION SURVEY WORKS AT TUNGKU, BRUNEI.
Client: RS & L MARINE SDN. BHD.

Scope of Work:

  • Provision of real-time DGPS positioning and navigation system onboard Lay Barge and Anchor Handling Tug.
  • Assist the Lay Barge movement.
  • Assist the Anchor Handling Tug on the anchor patterns and locating the anchors.
  • Provision of as-built survey report and drawing.


March


POSITIONING SERVICES AT KENCANA HL YARD, LUMUT, PERAK.
Client: RS & L MARINE SDN. BHD.

Scope of Work:

  • Provide positioning & navigation system on board.


February

BATHYMETRIC SURVEY AT PUCHONG POND, SELANGOR.
Client: JURUKUR TEMPATAN SDN. BHD.

Scope of Work:

  • Bathymetric Survey to determine the water depth.
  • To provide survey report and drawing


SHORE END SUBMARINE FIBRE OPTIC CABLE INSTALLATION SURVEY WORKS AT MERSING, JOHOR.
Client: RS & L MARINE SDN. BHD.

Scope of Work:

  • Provision of real-time DGPS positioning and navigation system onboard Lay Barge and Anchor Handling Tug.
  • Assist the Lay Barge movement.
  • Assist the Anchor Handling Tug on the anchor patterns and locating the anchors.
  • Provision of as-built survey report and drawing.


January

BATHYMETRIC SURVEY OF A SECTION OF KLANG RIVER.
Client: JURUKUR TEMPATAN SDN. BHD.

Scope of Work:

  • Bathymetric Survey to determine the water depth.
  • To provide survey report and drawing

BATHYMETRIC AND SIDE SCAN SONAR SURVEY AT TANJUNG KLING CARGO RAMP JETTY, PANTAI KUNDOR, MALACCA.
Client: ANM UTAMA (M) SDN. BHD.

Scope of Work:

  • Provide positioning & navigation system on board
  • Anchor handling aided by DGPS
  • Cable Search – Grapnel Run
  • To provide the as-built survey report and as-built drawing.