We provide reliable and cost effective services of highest quality.  
 
Key Personnel
back to main
  __________________________________________________________________________________    

DANIEL THANAM DIVEAN

IHO CAT. B, HYDROGRAPHIC SURVEYING,

UNIVERSITI TEKNOLOGI MALAYSIA

OFFSHORE SAFETY, SEA SURVIVAL & HELICOPTER UNDERWATER ESCAPE TRAINING.

CERTIFICATE IN LAND SURVEYING,

POLITEKNIK UNGKU OMAR, IPOH .

WORK EXPERIENCE

January 1995

Building Survey at Twin Tower , KLCC

Survey For Tunnel Construction, Karak Highway

PROJECTS UNDERTAKEN

July 1997

Preliminary Bathymetric Current Metering Survey For Proposed Jetty Construction Kota Merudu, Sabah .

Bathymetric Survey at Kimki River , Pasir Gudang, Johor.

Geo-Physical, Bathymetric Side Scan Sonar Survey For Submarine Cable Route Re-Alignment, Lekir, Perak.

Topographic Survey Monitoring For Pulau Indah Reclamation Project, Pulau Indah, Klang, Selangor.

1998-1999

Bathymetric Survey at Kenyir Lake , Terengganu.

Bathymetric & Tidal Analysis For 850 Acres Development at Brooklands Estate, Mukim Tanjung Dua Belas, Kuala Langat, Selangor.

Hydrographic Survey at TNB Power Station, Kapar Klang For Malaysian Dredging Corporation.

Secondment of Surveyors For CTOC Site Hazard Survey, Terengganu Offshore.

Hydrographic Survey at Proposed Chipmill Jetty at Mempakad, Sabah .

Bathymetric Survey at Sepangar Bay , Sabah .

Cabot Offshore Terminal And Pipeline, Port Dickson, Negri Sembilan

- Job Duties Include Pipelay Barge Navigation, Anchor Handling, As-Built Survey, Marine Piling, Conventional Buoy Mooring (CBM), Plem & Mattress Installation.

Topographic Survey at Kemaman Port , Terengganu.

Bathymetric Survey at KMT Berth 2 To Berth 8. Westport , Pulau Indah.

Bathymetric Survey at Puchong Mining Pond, Puchong, Selangor.

As-Built Survey For Twin 36” And Twin 44” Pipeline Butterworth, Penang .

Magnetometer Survey at Pulau Song-Song, Kedah.

Buoy Reinstallation & Tensioning For Cabot CBM Buoy at Port Dickson.

Bathymetric & Topographic Survey at Marang Rivermouth Improvement Terengganu.

Sidescan Sonar Survey, Pulau Nangka, Malacca.

Fibre Optic Cable Recovery/Positioning, Batu Pahat-Time Telecom, Johor

December 1999

Pre-Bathymetric Survey At PSC – Naval Dockyard, Lumut.

1999 – 2000

Reclamation of Land & Construction of Jetty at Outer Mole Area, PSC – Naval Dockyard Sdn. Bhd.

•  Phase 1: Land Reclamation

•  Phase 2: Widening of Existing Jetty to 220 Meters.

•  Phase 3: Replace & Repair of Existing Outer Mole.

•  Pre, Interim & Post-Bathymetric Survey For Phase 1, 2 & 3.

•  Topographic Survey Monitoring For Phase 1.

•  Marine Pile Setting-out For Phase 2.

•  Water Sampling

Lekir Coastal DEVELOPMENT: Phase 1

•  Pre, Interim & Post Bathymetric Survey

•  Monitoring Dredging Navigation System on Board.

•  Deepening of the Sungai Dinding/Selat Dinding Area, Lumut, Perak.

WAVEMASTER – LANGKAWI YACHT CENTER , KEDAH

•  Pre, Interim & Post Bathymetric Survey

•  Topographic Survey Monitoring

•  Complete Marine Setting-out Works For 3 Nos. of Fingers Jetties

MAINTENANCE DREDGING AT PSC – YARD SEAFRONT PULAU JEREJAK, PENANG .

•  Pre, Interim & Post-Bathymetric Survey

TANJONG TOKONG LAND RECLAMATION PROJECT – PHASE 1

•  Pre, Interim & Post, Land And Hydrographic Survey

WAVEMASTER – LANGKAWI YACHT CENTER , KEDAH

•  Pre, Interim and Post-Dredge Survey

KUALA KEDAH MARINA HARBOUR

•  Pre, Interim And Post-Bathymetric Survey

•  Pre, Monitoring And As-Built Land Survey

•  Dredging Monitoring Works

PRELIMINARY MARINE SURVEY WORKS FOR SUBMARINE POWER CABLE INSTALLATION – SEMPORNA TO BUM- BUM ISLAND .

Land Survey;

•  Establishment of Horizontal And Vertical Control

•  Topographic Survey Both Landing Point

Hydrographic Survey;

•  Bathymetric Survey ( Cable Route )

•  Soil Sampling

•  Side Scan Sonar Survey

•  Geophysical Sub-Bottom Profile Survey

•  Direct Reading Current Metering (DRCM)

•  Post Processing, Reporting And Plan Submission

2002 – 2003 PUTRAJAYA LAKE DREDGING PHASE 1 A

•  Pre, Interim And Post-Bathymetric Survey

•  Pre, Monitoring And As-Built Land Survey

•  Dredging Monitoring Works/Daily Progress Report Submission

•  Post Processing, Reporting And Plan Submission

•  Volume Computation

Project Brief:

Maintenance and capital dredging works were carried out to deepen the existing man- made lake (inundated) for recreational purpose.

The dredging works were carried out using a custom designed cutter-suction dredger coupled with Real-Time Kinematic (RTK) positioning system. Dredge slurry were pumped out up to a distance of 2500m into specially constructed sedimentation ponds where heavier material were allowed to settle with sufficient retention time and specially treated with environment friendly chemicals to only allow clear water to outflow into the lake (10 – 30 p.p.m)

Dredge material were removed from the sedimentation ponds and disposed off at approved dump sites. All hydrographic survey was fully complemented by in-house resources.

April 2004

Bathymetric Survey at Sg.Terengganu

September 2004 DUMAI – MALACCA CABLE SYSTEM (DMCS)

•  Cable Route Survey

•  Magnetometer Survey

•  Anchor Positioning/Pattern

•  DGPS Positioning & Navigation System

January 2005 SUBMARINE FIBRE OPTIC CABLE (REPAIR SURVEY WORKS, AT SEGMENT ‘K', MUAR – TG. SEGENTING, BT. PAHAT, JOHOR.)

•  Cable Route Survey

•  Magnetometer Survey

•  Anchor Positioning/Pattern

•  DGPS Positioning & Navigation System

February 2005

Bathymetric Survey at Sg.Terengganu

March 2005 RELOCATION/INSTALLATION OF SUBMARINE FIBRE

OPTIC CABLE AT SEGMENT ‘K', MUAR – TG. SEGENTING,

BT. PAHAT, JOHOR.

•  Topographic Survey

•  Cable Route Survey

•  Magnetometer Survey

•  Anchor Positioning/Pattern

•  DGPS Positioning & Navigation System

April 2005 POSITIONING & GRAB SAMPLING WORKS, LAHAD DATU, SABAH

•  Positioning & Navigation To Grab Sampling Location

•  Grab Sampling Works

April 2005 SHORE END INSTALLATION SURVEY WORKS, AT PENGKALAN BALAK, MALACCA.

•  Cable Route Survey

•  Anchor Positioning/Pattern

•  DGPS Positioning & Navigation System

June 2005 SUBMARINE FIBRE OPTIC CABLE (REPAIR WORK AT

SEGMENT ‘D' DAMAR LAUT – KUALA KURAU )

•  Cable Route Survey

•  Anchor Positioning/Pattern

•  DGPS Positioning & Navigation System

July 2005 SUBMARINE FIBRE OPTIC CABLE (REPAIR WORK AT

SEGMENT ‘E' DAMAR LAUT – KUALA KURAU)

•  Cable Route Survey

•  Anchor Positioning/Pattern

•  DGPS Positioning & Navigation System

September 2005 SUBMARINE FIBRE OPTIC CABLE (REPAIR WORK AT SEGMENT ‘H' PORT KLANG – PORT DICKSON)

•  Cable Route Survey

•  Anchor Positioning/Pattern

•  DGPS Positioning & Navigation System

December 2005 AS-BUILT SURVEY WORKS REBURIAL OF EXPOSED

SEA-ME-WE 3 CABLE AT KUALA MUDA, KEDAH.

•  Cable Route Survey

•  DGPS Positioning & Navigation System

January 200 6 REAL TIME KINEMATIC (RTK) SURVEY WORKS AT PETRONAS GAS PIPELINES.

•  To provide positioning works at Shah Alam, Puchong, and Putrajaya.

February 2006 RELOCATION OF A SECTION OF SEGMENT ‘G',

SUBMARINE FIBRE OPTIC CABLE FOR TIME DOT COM AT PULAU PINTU GEDONG, PORT KLANG, SELANGOR.

•  Cable Route Survey

•  Anchor Positioning/Pattern

•  DGPS Positioning & Navigation System

May 2006 SUBMARINE FIBRE OPTIC CABLE (REPAIR

WORKS AT SEGMENT ‘V', SUMATERA – BANGKA –

KUALA TUNGKAL, JAMBI , INDONESIA )

•  Cable Route Survey

•  Anchor Positioning/Pattern

•  DGPS Positioning & Navigation System

August 2006 SUBMARINE FIBRE OPTIC CABLE (REPAIR SURVEY WORKS AT SEGMENT ‘M' TG. BELUNGKOR – KONG KONG, JOHOR).

•  Cable Route Survey

•  Anchor Positioning/Pattern

•  DGPS Positioning & Navigation System

October 2006 BROWN FIELD HEAVY-LIFT / SALVAGE RECOVERY PROJECT (FREELANCE SURVEYOR)

•  Anchor Positioning/Pattern

•  DGPS Positioning & Navigation System

October 2006 SUBMARINE FIBRE OPTIC CABLE RELOCATION SURVEY WORKS OF SEGMENT ‘DW' – PUKET – KANTANG & SEGMENT ‘EW' – SATUN - KANTANG , THAILAND

•  Cable Route Survey

•  Anchor Positioning/Pattern

•  DGPS Positioning & Navigation System

November 2006 PRE-SURVEY FOR THE INSTALLATION OF POWER CABLE AT PULAU SEBATIK, TAWAU, SABAH

•  Cable Route Survey

•  Probing Works

November 2006 SUBMARINE FIBRE OPTIC CABLE (REPAIR

WORKS AT SEGMENT ‘V', SUMATERA – BANGKA –

KUALA TUNGKAL, JAMBI , INDONESIA )

•  Cable Route Survey

•  Anchor Positioning/Pattern

•  DGPS Positioning & Navigation System

November 2006 BATHYMETRIC SURVEY WORKS FOR PERMANENT WATER SUPPLY TO 3 X 700 MW COAL FIRED POWER PLANT AT TG. BIN, JOHOR

•  Bathymetric Survey

January 2007 SIDE SCAN SONAR SURVEY WORKS AT NATUNA SEA, INDONESIA (FREELANCE SURVEYOR)

•  Side Scan Sonar Survey

SOFTWARE SKILLS

~ AutoCAD 12, 13, 14, & 2000/04

~Mininav Navigation & Processing Software

~NGL Navigation Software

~HYDROpro Navigation & Processing Software

ATTENDED HYDRO 2001 CONFERENCE, UNIVERSITY OF EAST ANGLIA , NORWICH , UNITED KINGDOM .

 
 
SCOPE OF SERVICES
 

HYDROGRAPHIC SURVEYING

LAND SURVEYING

 
 
     
copyright Hydro Mappers Sdn Bhd   web design & managed by webzworks